HEPS中文
IHEP
CAS
Contact Us
Home
About HEPS
Brief Introduction
Organization
Schedule
Chronicle of Events
Site
Supports from Beijing
Facility
Overview
Accelerator
Beamline
News and Events
News
Upcoming and Events
Workshops
HEPS in the media
Archive
Publications
Images
Videos
Brochures
Annual Reports
Software
Job Openings
Call for Phase II
Toggle navigation
Home
About HEPS
Events
Research News
Upcoming Events
IGDB in Media
Facility
Overview
Accelerator
Beamline
News and Events
News
Upcoming and Events
Workshops
HEPS in the media
Archive
Publications
Images
Videos
Brochures
Annual Reports
Software
Chronicle of Events
Job Openings
Mock-up module of a standard cell of HEPS storage ring
Image of HEPS site after snow (shot in Feb. 2019)
HEPS Building 3D model(aerial view, at daytime)
HEPS Building 3D Model (aerial view, night)
HEPS Building 3D model
More News
Delegation of Ministry of Science, Innovation and Universities of Spain Visited HEPS
Oct 11,2024
On October 29, Dr. Juan Cruz Cigudosa, Secretary of State, aheading Spanish delegation from the Ministry of Science, Innovation and Universities of Spain visited the High Energy Photon Source (HEPS).
Electron Beam in HEPS Storage Ring Exceeds 10mA
Aug 21,2024
A major milestone was marked in the construction of HEPS on August 18, 2024. Electron beams with currents higher than 10mA were successfully stored in the High Energy Photon Source (HEPS) storage ring. This achievement signifies the completion of the accelerator complex and the start of beam comm...
HEPS Storage Ring Installation Completed
Jul 05,2024
On July 1, the last shielded bellows was connected in the tunnel, completing the installation of the HEPS storage ring and signifying that all components of the HEPS storage ring have been linked up and the storage ring is ready for inter-system commissioning. The perimeter of the HEPS storage r...
HEPS 500 MHz Cryomodule Successfully Developed
Apr 11,2024
The first 500 MHz superconducting accelerator module of the High Energy Photon Source (HEPS), a major national science and technology infrastructure project in China, completed a high-power horizontal test at cryogenic temperature on March 26, 2024. The results exceeded the facility’s design spe...
Publications
Brochures
Images
Videos
06
Nov
2023
Upcoming Events
MEDSI2023-the 12th Inte...
map